Operation steps and videos for hydrostatic testing machine and blasting test bench

       

    Hydrostatic pressure testing machine, blasting test bench. It is divided into manual control, PLC control, and computer control. Under these three control systems, it is further divided into with protective cover and without protective cover. Low voltage detection can be carried out without protective cover, while high voltage must choose safety measures. Safety is the top priority and cannot be taken lightly. Below, the editor will bring you a video and step-by-step report of a manual low-pressure hydrostatic pressure testing machine, a blasting test bench without a protective cover.


    Firstly, introduce the hydrostatic pressure test. Prepare the ZTS-ZTM16 manual hydrostatic pressure test machine, a blasting test bench, connect the air circuit according to the instructions, test the test piece, and check for leaks or loose connections by introducing water or hydraulic oil. If possible, install an acrylic transparent cover. After confirming the accuracy, check whether the driving air source is reset to zero, whether the driving switch, high-pressure switch, unloading switch, etc. are closed, and whether the peak pressure gauge is reset to zero. After completion, turn on the drive switch and high pressure switch in sequence, adjust the drive pressure. During the static pressure test, when the required high pressure is reached, turn off the drive switch and perform the pressure holding test. When the time is up, turn on the unloading switch to release the pressure. After releasing the pressure, remove the tested part and follow the above steps to proceed to the next test.


    During the blasting test, prepare a ZTS-ZTM16 manual hydrostatic pressure testing machine and a blasting test bench. Connect the air circuit according to the instructions, test the object, and check for leaks or loose connections by introducing water or hydraulic oil. If possible, install an Yakeli transparent cover. After confirming the accuracy, check whether the driving air source is reset to zero, whether the driving switch, high-pressure switch, unloading switch, etc. are closed, and whether the peak pressure gauge is reset to zero. After completion, turn on the drive switch and high pressure switch in sequence, adjust the drive pressure until the pipe bursts. The peak pressure gauge records the burst pressure at the moment of bursting. After bursting, remove the test piece and proceed to the next operation according to the above steps.





    Legal statement: The above content belongs to the copyright of Taizhou Feentor - Plagiarism will be prosecuted

    本站使用百度智能门户搭建 管理登录